Project Management & Consulting Fee (TT 38/2026) API
Interpolated rates and amounts for project management, feasibility study, design, reviews, tendering and supervision under Appendix VIII of TT 38/2026.
Computes the norm rates of Circular 38/2026/TT-BXD, Appendix VIII (in force 1 July 2026): project management (Table 1.1), investment-policy proposal, pre-feasibility and feasibility studies, economic-technical reports (2.1–2.6), design by work type, class and design steps (2.7–2.16, with the 55 % / 60 % shop-drawing share and Table DD1 for equipment-heavy civil works), reviews of studies, design and estimates (2.17–2.20, with minimum fees), tender documents and bid evaluation (2.21–2.23, split 45 / 55 %) and supervision of works, equipment installation and surveys (2.24–2.26).
Rates between two scales use formula (1) of the circular, Nt = Nb − (Nb − Na)/(Ga − Gb) × (Gt − Gb), shown step by step; scales above an open table go by estimate and are returned as null with the reason. Adjustment coefficients (remote / island areas, multi-province, self-managed, equipment ≥ 50 %, renovation, typical design, national important project, equipment ≥ 25 % for estimate reviews) are applied and listed.
All amounts exclude VAT. Tables are imported from the signed PDF and spot-checked; an estimating expert should confirm before use. Reference only.
Markdown · OpenAPI · Postman · llms.txt
Parameters
| Name | In | Type | Required | Default | |
|---|---|---|---|---|---|
work_type | query | string | yes | civil, industrial, transport, agriculture or infrastructure (Vietnamese names accepted). | |
construction_cost | query | number | yes | Construction cost, VND excluding VAT. | |
equipment_cost | query | number | no | Equipment cost, VND excluding VAT. | |
construction_class | query | string | no | special, I, II, III, IV (needed for design). | |
design_steps | query | number | no | 2 | 2 = shop drawings only, 3 = technical design + shop drawings. |
services | query | string | no | Comma list, e.g. project_management,feasibility,design,review_design,review_estimate,bidding_construction,supervision_construction,supervision_equipment. | |
remote_area | query | boolean | no | Sea, island, land border or extremely difficult commune (PM × 1.35, supervision × 1.2). Also multi_province, self_managed, renovation, typical_design, national_important, k. | |
approval_date | query | string | no | YYYY-MM-DD; before 2026-07-01 adds the transitional warning. |
Example
curl "https://apibox.io.vn/v1/vn-consulting-fee?work_type=civil&construction_cost=120000000000&equipment_cost=30000000000&construction_class=III&services=project_management,design,supervision_construction" \
-H "Authorization: Bearer YOUR_API_KEY"const res = await fetch('https://apibox.io.vn/v1/vn-consulting-fee?work_type=civil&construction_cost=120000000000&equipment_cost=30000000000&construction_class=III&services=project_management,design,supervision_construction', {
method: 'GET',
headers: {
Authorization: 'Bearer YOUR_API_KEY',
},
});
const data = await res.json();
console.log(data);import requests
res = requests.get(
"https://apibox.io.vn/v1/vn-consulting-fee?work_type=civil&construction_cost=120000000000&equipment_cost=30000000000&construction_class=III&services=project_management,design,supervision_construction",
headers={"Authorization": "Bearer YOUR_API_KEY"},
timeout=30,
)
print(res.json())<?php
$ch = curl_init('https://apibox.io.vn/v1/vn-consulting-fee?work_type=civil&construction_cost=120000000000&equipment_cost=30000000000&construction_class=III&services=project_management,design,supervision_construction');
curl_setopt_array($ch, [
CURLOPT_RETURNTRANSFER => true,
CURLOPT_HTTPHEADER => ['Authorization: Bearer YOUR_API_KEY'],
]);
$response = curl_exec($ch);
print_r(json_decode($response, true));Response
{
"work_type": "civil",
"work_type_vi": "Công trình dân dụng",
"construction_cost": 120000000000,
"equipment_cost": 30000000000,
"construction_class": "III",
"design_steps": 2,
"services": [
{
"service": "project_management",
"name_vi": "Chi phí quản lý dự án",
"name_en": "Project management",
"table": "Bảng 1.1",
"base": "construction_cost + equipment_cost",
"base_vnd": 150000000000,
"rate_pct": 1.9515,
"interpolation": "Nt = Nb − (Nb − Na)/(Ga − Gb) × (Gt − Gb) = 2.017 − (2.017 − 1.886)/(200 − 100) × (150 − 100) = 1.9515 %",
"k": [],
"amount_vnd": 2927250000,
"note": "Excludes contingency and the investor's own appraisal costs (Bảng 1.1 notes)."
},
{
"service": "design",
"name_vi": "Thiết kế xây dựng",
"name_en": "Construction design",
"table": "Bảng 2.8",
"base": "construction_cost",
"base_vnd": 120000000000,
"construction_class": "III",
"rate_pct": 2.214,
"interpolation": "Nt = Nb − (Nb − Na)/(Ga − Gb) × (Gt − Gb) = 2.25 − (2.25 − 2.07)/(200 − 100) × (120 − 100) = 2.214 %",
"k": [],
"amount_vnd": 2656800000,
"includes": "design documents, cost estimate (12 % of the design cost), technical specifications, maintenance procedure, author supervision, professional liability insurance (mục 3.1, 3.4)"
},
"…"
],
"total_vnd": 7726290000,
"vat": "All rates and amounts exclude VAT.",
"formula": "Nt = Nb − (Nb − Na)/(Ga − Gb) × (Gt − Gb) (Phụ lục VIII Phần I, công thức (1)); cost = base × Nt × Π k",
"legal": [
{
"ref": "Thông tư 38/2026/TT-BXD ngày 26/6/2026 — Phụ lục VIII Định mức chi phí quản lý dự án và tư vấn xây dựng (Phần I công thức (1); Chương I, II)",
"effective_from": "2026-07-01",
"url": "https://datafiles.chinhphu.vn/cpp/files/vbpq/2026/7/38.2026.tt-bxd-pl8dmqldavatvxd_signed1.pdf"
},
{
"ref": "Thông tư 12/2021/TT-BXD Phụ lục VIII (và TT 09/2024, TT 08/2025) — hết hiệu lực từ 01/7/2026",
"effective_to": "2026-06-30"
},
"…"
],
"source": {
"doc": "Thông tư 38/2026/TT-BXD, Phụ lục VIII — Định mức chi phí quản lý dự án và tư vấn xây dựng",
"url": "https://datafiles.chinhphu.vn/cpp/files/vbpq/2026/7/38.2026.tt-bxd-pl8dmqldavatvxd_signed1.pdf",
"sha256": "74738c35c1da28e78cf78903c280efb69d287295c7f88c49b70f75c3d0d9fbbf"
},
"unverified": "Rate tables imported automatically from the signed PDF and spot-checked; pending review by an estimating expert.",
"disclaimer": "Reference only, not legal / estimating advice; check the official text.",
"disclaimer_vi": "Thông tin tham khảo, không phải tư vấn pháp lý / dự toán; hãy đối chiếu văn bản chính thức.",
"reviewed": "2026-11-16"
}
Use cases
- Budget consulting costs in a total investment estimate
- Price a design or supervision proposal
- Check a project management unit budget
- Automate cost items in estimating software
FAQ
How is a rate between two table columns computed?
By formula (1) of Appendix VIII: Nt = Nb − (Nb − Na)/(Ga − Gb) × (Gt − Gb), with Ga / Gb the upper / lower scales. The answer shows the numbers.
What base is the design rate applied to?
The construction cost excluding VAT of each work (by type and class). With technical design + shop drawings the shop drawings add 55 % (60 % industrial) of the technical-design rate.
Which circular applies to projects approved before July 2026?
This API uses TT 38/2026. Projects approved earlier may keep TT 12/2021 under the transitional rules of Decree 206/2026 (not verified); approval_date adds a warning.
Related APIs
JSON Validator
Check JSON syntax with exact line and column of errors, and validate data against a JSON Schema (draft 4, 7, 2019-09 or 2020-12).
{ }JSON Formatter
Pretty print JSON with 0-8 spaces or tabs, minify it, or sort object keys recursively. Syntax errors are reported with line and column.
CSVCSV to JSON
Convert CSV into an array of JSON objects using the header row, with delimiter auto-detection, number and boolean typing, and row-level errors.