Construction Permit Check API
Is a construction permit needed under the 2025 Construction Law? Exemption clause, start notice, authority, 7-day time limit and dossier list.
A rule engine over Construction Law 135/2025/QH15 (in force 1/7/2026; the permit exemptions of Article 43(2)–(3) since 1/1/2026) and Decree 217/2026/ND-CP. Describe the works with type (house for a detached house, grade_iv, other, or an exempt group such as emergency, temporary, telecom_passive, advertising, public_investment, appraised_project…), work (new, repair, relocate), floors, floor_area (total floor area, m²) and planned_area (true if the site is in a functional / urban-development area of a general plan, a construction area of a commune plan or an area with architecture management regulations).
The response says permit_required (true, false or depends when a fact is missing), the exempting clause (e.g. houses under 7 floors and under 500 m² outside planned areas, Article 43(2)(g); interior repairs without structural change, (h)), whether a start notice must be sent (not for houses of households), the start conditions, and for permits: the authority (commune People's Committee for houses and grade III–IV works), the time limit (7 working days for houses, 10 / 9 for other works, 5 for extension or reissue), online submission, the dossier, the 12-month start window and extensions.
Whether a site lies in a planned area is not in any open dataset: ask the commune People's Committee. The Ministry of Construction notes that most urban houses are inside such areas and still need a permit.
Markdown · OpenAPI · Postman · llms.txt
Parameters
| Name | In | Type | Required | Default | |
|---|---|---|---|---|---|
type | query | string | no | house | house, grade_iv, other or an exempt group (state_secret, emergency, temporary, special_public, defence_land, public_investment, linear, offshore_airport, advertising, telecom_passive, appraised_project). |
work | query | string | no | new | new, repair or relocate. |
floors | query | number | no | Number of floors (houses). | |
floor_area | query | number | no | Total floor area, m². | |
planned_area | query | boolean | no | Site lies in a planned / architecture-managed area (Art. 43(2)(g)). | |
owner | query | string | no | household or organisation. | |
interior_only | query | boolean | no | Repair: only inside the building. | |
facade_on_managed_street | query | boolean | no | Repair: the facade faces an urban street with architecture management. | |
structural | query | boolean | no | Repair affects load-bearing structure. | |
change_use | query | boolean | no | Repair changes the use. | |
heritage | query | boolean | no | Site in a heritage protection zone. |
Example
curl "https://apibox.io.vn/v1/vn-build-permit?type=house&floors=4&floor_area=320&planned_area=true" \
-H "Authorization: Bearer YOUR_API_KEY"const res = await fetch('https://apibox.io.vn/v1/vn-build-permit?type=house&floors=4&floor_area=320&planned_area=true', {
method: 'GET',
headers: {
Authorization: 'Bearer YOUR_API_KEY',
},
});
const data = await res.json();
console.log(data);import requests
res = requests.get(
"https://apibox.io.vn/v1/vn-build-permit?type=house&floors=4&floor_area=320&planned_area=true",
headers={"Authorization": "Bearer YOUR_API_KEY"},
timeout=30,
)
print(res.json())<?php
$ch = curl_init('https://apibox.io.vn/v1/vn-build-permit?type=house&floors=4&floor_area=320&planned_area=true');
curl_setopt_array($ch, [
CURLOPT_RETURNTRANSFER => true,
CURLOPT_HTTPHEADER => ['Authorization: Bearer YOUR_API_KEY'],
]);
$response = curl_exec($ch);
print_r(json_decode($response, true));Response
{
"permit_required": true,
"exemption": null,
"reasoning": [
"The site lies in a planned / architecture-managed area listed in Điều 43 khoản 2 điểm g → permit required."
],
"start_notice": {
"required": false
},
"start_conditions": {
"vi": "Có giấy phép xây dựng (nếu thuộc diện phải có) và xây trên đất ở hợp pháp",
"en": "A permit where required, and legal residential land",
"legal_ref": "Điều 48 khoản 3"
},
"permit": {
"kind": "new",
"authority": "Commune People's Committee (UBND cấp xã)",
"processing_working_days": 7,
"extension_or_reissue_working_days": 5,
"submit": "Online, end-to-end, on the National Public Service Portal (dichvucong.gov.vn); in person only when the online system fails (NĐ 217/2026 Điều 54, 56).",
"dossier": [
{
"vi": "Đơn đề nghị cấp giấy phép xây dựng (Mẫu số 01 Phụ lục II NĐ 217/2026)",
"en": "Application form (Form 01, Annex II, Decree 217/2026)"
},
{
"vi": "Một trong các giấy tờ hợp pháp về đất đai (Điều 55 NĐ 217/2026); không phải nộp nếu đã có trên cơ sở dữ liệu quốc gia",
"en": "A legal land-use document (Art. 55) — not needed if already in the national database"
},
{
"vi": "Bản vẽ: mặt bằng công trình trên lô đất kèm sơ đồ vị trí; mặt bằng các tầng, mặt đứng, mặt cắt chính; mặt bằng móng, mặt cắt móng kèm sơ đồ đấu nối cấp nước, thoát nước, cấp điện",
"en": "Drawings: site plan with location map; floor plans, main elevations and sections; foundation plan / section with water, drainage and power connections"
}
],
"start_within_months": 12,
"extensions": "At most 2 extensions of 12 months each (NĐ 217/2026 Điều 63)",
"fee": "Permit fee (lệ phí cấp giấy phép xây dựng) is set by each provincial People's Council.",
"legal_ref": "NĐ 217/2026/NĐ-CP Điều 53, 54, 60, 61, 63"
},
"input": {
"type": "house",
"work": "new",
"owner": "household",
"floors": 4,
"floor_area": 320,
"planned_area": true
},
"transition": "Works exempt under the 2014 law that met the start conditions before 1/1/2026 remain exempt; permitted works now exempt need no permit amendment when the design changes (Điều 95 khoản 3).",
"legal": [
{
"ref": "Luật Xây dựng số 135/2025/QH15, Điều 43 (khoản 2, 3 có hiệu lực từ 01/01/2026), Điều 44, 48, 95",
"effective_from": "2026-07-01"
}
],
"disclaimer": "Reference only, not legal advice; whether a site lies in a planned area must be confirmed with the commune People's Committee.",
"disclaimer_vi": "Thông tin tham khảo, không phải tư vấn pháp lý; việc khu đất có thuộc khu vực quy hoạch / có quy chế quản lý kiến trúc hay không cần hỏi UBND cấp xã.",
"reviewed": "2026-11-11"
}
Use cases
- Tell house builders whether they must apply for a permit
- Add a permit checklist to a real-estate or design-and-build website
- Pre-screen loan applications for house construction
- Answer citizens' questions in a commune chatbot
FAQ
Are all houses under 7 floors exempt now?
No. They are exempt only below 500 m² of floor area and outside the planned / architecture-managed areas listed in Article 43(2)(g); most urban plots are inside such areas.
How long does a house permit take?
7 working days from a complete dossier submitted online (Decree 217/2026, Article 54); extension or reissue 5 working days.
Do households have to notify the start of works?
No. Houses of households and individuals do not send a start notice (Article 43(3), Article 48); other exempt works do.
Related APIs
JSON Validator
Check JSON syntax with exact line and column of errors, and validate data against a JSON Schema (draft 4, 7, 2019-09 or 2020-12).
{ }JSON Formatter
Pretty print JSON with 0-8 spaces or tabs, minify it, or sort object keys recursively. Syntax errors are reported with line and column.
CSVCSV to JSON
Convert CSV into an array of JSON objects using the header row, with delimiter auto-detection, number and boolean typing, and row-level errors.