# Construction Permit Check API

> Is a construction permit needed under the 2025 Construction Law? Exemption clause, start notice, authority, 7-day time limit and dossier list.

- Endpoint: `GET | POST https://apibox.io.vn/v1/vn-build-permit`
- Category: Data & JSON
- HTML docs: https://apibox.io.vn/docs/vn-build-permit/ (Vietnamese: https://apibox.io.vn/vi/docs/vn-build-permit/)
- Online tool: https://apibox.io.vn/tools/vn-build-permit/
- Authentication: `Authorization: Bearer <API key>` or `X-API-Key: <API key>` (free key: https://apibox.io.vn/dashboard/#signup)

A rule engine over Construction Law 135/2025/QH15 (in force 1/7/2026; the permit exemptions of Article 43(2)–(3) since 1/1/2026) and Decree 217/2026/ND-CP. Describe the works with `type` (`house` for a detached house, `grade_iv`, `other`, or an exempt group such as `emergency`, `temporary`, `telecom_passive`, `advertising`, `public_investment`, `appraised_project`…), `work` (`new`, `repair`, `relocate`), `floors`, `floor_area` (total floor area, m²) and `planned_area` (true if the site is in a functional / urban-development area of a general plan, a construction area of a commune plan or an area with architecture management regulations).

The response says `permit_required` (true, false or `depends` when a fact is missing), the exempting clause (e.g. houses under 7 floors and under 500 m² outside planned areas, Article 43(2)(g); interior repairs without structural change, (h)), whether a start notice must be sent (not for houses of households), the start conditions, and for permits: the authority (commune People's Committee for houses and grade III–IV works), the time limit (7 working days for houses, 10 / 9 for other works, 5 for extension or reissue), online submission, the dossier, the 12-month start window and extensions.

Whether a site lies in a planned area is not in any open dataset: ask the commune People's Committee. The Ministry of Construction notes that most urban houses are inside such areas and still need a permit.

## Parameters

| Name | In | Type | Required | Default | Description |
|---|---|---|---|---|---|
| `type` | query | string | no | `house` | `house`, `grade_iv`, `other` or an exempt group (`state_secret`, `emergency`, `temporary`, `special_public`, `defence_land`, `public_investment`, `linear`, `offshore_airport`, `advertising`, `telecom_passive`, `appraised_project`). |
| `work` | query | string | no | `new` | `new`, `repair` or `relocate`. |
| `floors` | query | number | no |  | Number of floors (houses). |
| `floor_area` | query | number | no |  | Total floor area, m². |
| `planned_area` | query | boolean | no |  | Site lies in a planned / architecture-managed area (Art. 43(2)(g)). |
| `owner` | query | string | no |  | `household` or `organisation`. |
| `interior_only` | query | boolean | no |  | Repair: only inside the building. |
| `facade_on_managed_street` | query | boolean | no |  | Repair: the facade faces an urban street with architecture management. |
| `structural` | query | boolean | no |  | Repair affects load-bearing structure. |
| `change_use` | query | boolean | no |  | Repair changes the use. |
| `heritage` | query | boolean | no |  | Site in a heritage protection zone. |

## Example request

```bash
curl "https://apibox.io.vn/v1/vn-build-permit?type=house&floors=4&floor_area=320&planned_area=true" \
  -H "Authorization: Bearer YOUR_API_KEY"
```

## Example response

```json
{
  "permit_required": true,
  "exemption": null,
  "reasoning": [
    "The site lies in a planned / architecture-managed area listed in Điều 43 khoản 2 điểm g → permit required."
  ],
  "start_notice": {
    "required": false
  },
  "start_conditions": {
    "vi": "Có giấy phép xây dựng (nếu thuộc diện phải có) và xây trên đất ở hợp pháp",
    "en": "A permit where required, and legal residential land",
    "legal_ref": "Điều 48 khoản 3"
  },
  "permit": {
    "kind": "new",
    "authority": "Commune People's Committee (UBND cấp xã)",
    "processing_working_days": 7,
    "extension_or_reissue_working_days": 5,
    "submit": "Online, end-to-end, on the National Public Service Portal (dichvucong.gov.vn); in person only when the online system fails (NĐ 217/2026 Điều 54, 56).",
    "dossier": [
      {
        "vi": "Đơn đề nghị cấp giấy phép xây dựng (Mẫu số 01 Phụ lục II NĐ 217/2026)",
        "en": "Application form (Form 01, Annex II, Decree 217/2026)"
      },
      {
        "vi": "Một trong các giấy tờ hợp pháp về đất đai (Điều 55 NĐ 217/2026); không phải nộp nếu đã có trên cơ sở dữ liệu quốc gia",
        "en": "A legal land-use document (Art. 55) — not needed if already in the national database"
      },
      {
        "vi": "Bản vẽ: mặt bằng công trình trên lô đất kèm sơ đồ vị trí; mặt bằng các tầng, mặt đứng, mặt cắt chính; mặt bằng móng, mặt cắt móng kèm sơ đồ đấu nối cấp nước, thoát nước, cấp điện",
        "en": "Drawings: site plan with location map; floor plans, main elevations and sections; foundation plan / section with water, drainage and power connections"
      }
    ],
    "start_within_months": 12,
    "extensions": "At most 2 extensions of 12 months each (NĐ 217/2026 Điều 63)",
    "fee": "Permit fee (lệ phí cấp giấy phép xây dựng) is set by each provincial People's Council.",
    "legal_ref": "NĐ 217/2026/NĐ-CP Điều 53, 54, 60, 61, 63"
  },
  "input": {
    "type": "house",
    "work": "new",
    "owner": "household",
    "floors": 4,
    "floor_area": 320,
    "planned_area": true
  },
  "transition": "Works exempt under the 2014 law that met the start conditions before 1/1/2026 remain exempt; permitted works now exempt need no permit amendment when the design changes (Điều 95 khoản 3).",
  "legal": [
    {
      "ref": "Luật Xây dựng số 135/2025/QH15, Điều 43 (khoản 2, 3 có hiệu lực từ 01/01/2026), Điều 44, 48, 95",
      "effective_from": "2026-07-01"
    }
  ],
  "disclaimer": "Reference only, not legal advice; whether a site lies in a planned area must be confirmed with the commune People's Committee.",
  "disclaimer_vi": "Thông tin tham khảo, không phải tư vấn pháp lý; việc khu đất có thuộc khu vực quy hoạch / có quy chế quản lý kiến trúc hay không cần hỏi UBND cấp xã.",
  "reviewed": "2026-11-11"
}
```

## Use cases

- Tell house builders whether they must apply for a permit
- Add a permit checklist to a real-estate or design-and-build website
- Pre-screen loan applications for house construction
- Answer citizens' questions in a commune chatbot

## FAQ

### Are all houses under 7 floors exempt now?

No. They are exempt only below 500 m² of floor area and outside the planned / architecture-managed areas listed in Article 43(2)(g); most urban plots are inside such areas.

### How long does a house permit take?

7 working days from a complete dossier submitted online (Decree 217/2026, Article 54); extension or reissue 5 working days.

### Do households have to notify the start of works?

No. Houses of households and individuals do not send a start notice (Article 43(3), Article 48); other exempt works do.