Construction Contract Advance & Payments (ND 210/2026) API

Minimum and maximum advance, advance guarantee, performance security, warranty, penalty cap and payment schedule with recovery under Decree 210/2026.

GETPOSThttps://apibox.io.vn/v1/vn-construction-contract

Applies Decree 210/2026/NĐ-CP on construction contracts (in force 1 July 2026, replacing Decree 37/2015 and Decree 50/2021): minimum advance by contract type and value (consulting 15 / 20 %, works 10 / 15 / 20 %, supply and EPC 10 %), the 30 % ceiling, the advance guarantee for advances over 1 billion VND, recovery by the time payments reach 80 % of the price, performance security of 2–10 %, the 14-working-day payment deadline and the settlement / liquidation deadlines. Warranty periods and minimum warranty amounts (24 months and 3 % for special and class I works, 12 months and 5 % otherwise) come from Decree 207/2026; the 12 % penalty cap for public investment and PPP from Construction Law 2025 Article 86.

action=schedule (or payments / installments) builds the payment table: accepted value, advance recovered, retention, net payment, cumulative disbursement. late_amount, late_days, late_rate_pct give simple late-payment interest. Contracts signed before 1/7/2026 get the transitional note.

Outside public investment and PPP most terms are agreed by the parties; the public-investment values are then shown as reference. Reference only, not legal advice.

Markdown · OpenAPI · Postman · llms.txt

Parameters

NameInTypeRequiredDefault
contract_typequerystringyesconstruction, consulting, supply or epc (EC, EP, PC, EPC, turnkey, other).
contract_valuequerynumberyesContract price at signing, VND (incl. contingency).
fundingquerystringnopublicpublic (public investment / PPP) or other.
construction_classquerystringnospecial, I, II, III, IV (warranty).
advance_pctquerynumbernoAgreed advance %, checked against the minimum and the 30 % ceiling. Also performance_security_pct, retention_pct, recovery_pct.
installmentsquerynumbernoNumber of equal payment periods for the schedule, or payments = array of accepted values (VND).
contract_datequerystringnoYYYY-MM-DD; before 2026-07-01 adds the transitional note.
late_amountquerynumbernoLate payment amount, with late_days and late_rate_pct (annual %).

Example

curl "https://apibox.io.vn/v1/vn-construction-contract?contract_type=construction&contract_value=30000000000&funding=public&construction_class=II&installments=4" \
  -H "Authorization: Bearer YOUR_API_KEY"

Response

{
  "contract_type": "construction",
  "contract_type_vi": "Hợp đồng thi công xây dựng công trình",
  "contract_value": 30000000000,
  "funding": "public_investment_or_ppp",
  "regime": "NĐ 210/2026/NĐ-CP",
  "advance": {
    "min_pct": 15,
    "max_pct": 30,
    "rule": "works contract 10–50 tỷ: 15 % (điểm i)",
    "chosen_pct": 15,
    "amount_vnd": 4500000000,
    "guarantee_required": true,
    "guarantee": "Advance > 1 tỷ: an advance guarantee of the same value and currency is required before payment; it reduces as the advance is recovered (Điều 12.3.c, d).",
    "recovery": "Recovered through the payments; fully recovered when advance + payments for completed work reach 80 % of the contract price (Điều 12.3.m).",
    "price_adjustment": "The part of the price matching an advance above the minimum is not price-adjusted from the advance date (Điều 12.3.l)."
  },
  "performance_security": {
    "range_pct": [
      2,
      10
    ],
    "amount_range_vnd": [
      600000000,
      3000000000
    ],
    "rule": "2–10 % of the contract price; higher only as allowed by the bidding law; not required in the cases of Luật Đấu thầu Điều 68.2 (Điều 13.2.c, đ).",
    "returned": "After all obligations are met or the contractor has moved to the warranty obligation and handed over the warranty security (Điều 13.2.đ)."
  },
  "warranty": {
    "min_period_months": 12,
    "min_amount_pct": 5,
    "min_amount_vnd": 1500000000,
    "rule": "Public funds: warranty ≥ 12 months from acceptance and ≥ 5 % of the contract value, in cash or a bank warranty guarantee (NĐ 207/2026 Điều 32 khoản 2, 5, 7; NĐ 210/2026 Điều 13.2.g, Điều 20).",
    "equipment": "Equipment: per contract, not shorter than the manufacturer's warranty (Điều 32 khoản 6)."
  },
  "penalty": {
    "max_pct_of_violated_part": 12,
    "rule": "Public investment / PPP: contract penalty ≤ 12 % of the value of the violated part, plus damages as agreed (Luật Xây dựng 2025 Điều 86 khoản 3)."
  },
  "payment": {
    "deadline": "≤ 14 working days after the employer receives a complete valid payment file (Điều 28.4.l); ODA / foreign loans per the treaty (điểm m)",
    "late_interest": "Rate agreed in the contract; if not agreed, the overdue rate published by the contractor's bank for each late period (Điều 28.5). See /v1/vn-late-interest."
  },
  "settlement": {
    "settlement_days_max": 60,
    "settlement_days_max_large": 120,
    "liquidation_days_max": 45,
    "liquidation_days_max_large": 90,
    "rule": "Settlement ≤ 60 days after completion and acceptance (≤ 120 for large, complex contracts) — Điều 30.3; liquidation ≤ 45 days (≤ 90) — Điều 31.3.b."
  },
  "schedule": {
    "retention_pct": 0,
    "recovery_rate_pct": 18.75,
    "rows": [
      {
        "period": 1,
        "accepted_vnd": 7500000000,
        "advance_recovered_vnd": 1406250000,
        "retention_vnd": 0,
        "net_payment_vnd": 6093750000,
        "cumulative_accepted_vnd": 7500000000,
        "advance_outstanding_vnd": 3093750000,
        "cumulative_disbursed_pct": 35.3125
      },
      {
        "period": 2,
        "accepted_vnd": 7500000000,
        "advance_recovered_vnd": 1406250000,
        "retention_vnd": 0,
        "net_payment_vnd": 6093750000,
        "cumulative_accepted_vnd": 15000000000,
        "advance_outstanding_vnd": 1687500000,
        "cumulative_disbursed_pct": 55.625
      },
      "…"
    ],
    "fully_recovered": true,
    "method": "proportional_80: advance / (80 % × price) of each accepted amount, so the advance is recovered when the accepted (= disbursed) value reaches 80 % (default; interpretation of Điều 12.3.m — unverified)",
    "note": "Retention per payment is contractual (agreed_override); amounts exclude price adjustment and VAT."
  },
  "agreed_override": "Within the legal frame the contract may agree other advance schedules, retention and recovery (Điều 12.2); pass advance_pct, performance_security_pct, retention_pct, recovery_pct.",
  "legal": [
    {
      "ref": "Nghị định 210/2026/NĐ-CP ngày 15/6/2026 quy định chi tiết và hướng dẫn thi hành một số điều của Luật Xây dựng về hợp đồng xây dựng — Điều 12, 13, 20, 28, 30, 31, 33",
      "effective_from": "2026-07-01"
    },
    {
      "ref": "Luật Xây dựng số 135/2025/QH15 — Điều 83, 86 (khoản 3: phạt ≤ 12 % với dự án đầu tư công, PPP), 87",
      "effective_from": "2026-07-01"
    },
    "…"
  ],
  "disclaimer": "Reference only, not legal advice; check the official text and the contract.",
  "disclaimer_vi": "Thông tin tham khảo, không phải tư vấn pháp lý; hãy đối chiếu văn bản chính thức và hợp đồng.",
  "reviewed": "2026-11-16"
}

Use cases

  • Check the advance and bonds in a draft works contract
  • Generate the payment and advance-recovery table of a contract
  • Size the advance guarantee a bank has to issue
  • Validate contract terms in project-management software

FAQ

What is the minimum advance for a 30 billion VND works contract?

15 % (works contracts from 10 to 50 billion VND), at most 30 %; above 1 billion VND an advance guarantee of the same value is required (Decree 210/2026 Article 12).

When must the advance be fully recovered?

When the payments, advance included, reach 80 % of the contract price. By default the API recovers advance / (80 % × price) of each accepted amount; recovery_pct overrides it.

How long is the warranty?

For publicly funded works at least 24 months and 3 % for special and class I, 12 months and 5 % for other classes (Decree 207/2026 Article 32).