Construction Consulting Fee Calculator

Interpolated rates and amounts for project management, feasibility study, design, reviews, tendering and supervision under Appendix VIII of TT 38/2026.

Free tool: 20 requests per minute.

Result

Press “Run” to see the result.

Computes the norm rates of Circular 38/2026/TT-BXD, Appendix VIII (in force 1 July 2026): project management (Table 1.1), investment-policy proposal, pre-feasibility and feasibility studies, economic-technical reports (2.1–2.6), design by work type, class and design steps (2.7–2.16, with the 55 % / 60 % shop-drawing share and Table DD1 for equipment-heavy civil works), reviews of studies, design and estimates (2.17–2.20, with minimum fees), tender documents and bid evaluation (2.21–2.23, split 45 / 55 %) and supervision of works, equipment installation and surveys (2.24–2.26).

Rates between two scales use formula (1) of the circular, Nt = Nb − (Nb − Na)/(Ga − Gb) × (Gt − Gb), shown step by step; scales above an open table go by estimate and are returned as null with the reason. Adjustment coefficients (remote / island areas, multi-province, self-managed, equipment ≥ 50 %, renovation, typical design, national important project, equipment ≥ 25 % for estimate reviews) are applied and listed.

All amounts exclude VAT. Tables are imported from the signed PDF and spot-checked; an estimating expert should confirm before use. Reference only.

Use this in your code

curl "https://apibox.io.vn/v1/vn-consulting-fee?work_type=civil&construction_cost=120000000000&equipment_cost=30000000000&construction_class=III&services=project_management,design,supervision_construction" \
  -H "Authorization: Bearer YOUR_API_KEY"

API documentation → Get a free API key

FAQ

How is a rate between two table columns computed?

By formula (1) of Appendix VIII: Nt = Nb − (Nb − Na)/(Ga − Gb) × (Gt − Gb), with Ga / Gb the upper / lower scales. The answer shows the numbers.

What base is the design rate applied to?

The construction cost excluding VAT of each work (by type and class). With technical design + shop drawings the shop drawings add 55 % (60 % industrial) of the technical-design rate.

Which circular applies to projects approved before July 2026?

This API uses TT 38/2026. Projects approved earlier may keep TT 12/2021 under the transitional rules of Decree 206/2026 (not verified); approval_date adds a warning.