Rooftop Solar Calculator Vietnam

Estimate rooftop solar output by province (EVN PVout 2026), bill savings on EVN tariffs, surplus sales up to 50 % (Decree 243/2026), payback, NPV and IRR.

Free tool: 20 requests per minute.

Result

Press “Run” to see the result.

Give the province (34 provinces; old pre-2025 names are mapped), the size (kwp, or roof_m2 at 5.5 m² per kWp) and the consumption (monthly_kwh as one number or 12 values, or monthly_bill for households). Monthly generation uses EVN’s theoretical PVout coefficients for 2026 (kWh/kWp per month for each province, the values used by law to cap surplus sales), with an orientation factor.

Self-consumption is the part of generation used during the day (daytime_share, default 35 % of consumption for households, 65 % for businesses). Bill savings come from the vn-electricity engine (5-tier household tariff from 1 November 2026, VAT included; business savings at the normal-hour rate). Surplus is sold up to 50 % of the theoretical output (Decree 58/2025 Article 14 as amended by Decree 243/2026) at the previous year’s average market energy price, 844.8 đ/kWh for 2026 (surplus_price to override).

With cost (or cost_per_kwp; otherwise an assumed 11 million đ/kWp is flagged) the result gives payback, NPV (discount_percent, default 8) and IRR over years (default 25) with degradation and O&M, plus the notification or registration procedure for the size and connection.

Use this in your code

curl -X POST "https://apibox.io.vn/v1/vn-solar-roi" \
  -H "Authorization: Bearer YOUR_API_KEY" \
  -H "Content-Type: application/json" \
  -d '{"province":"Hà Nội","kwp":5,"monthly_kwh":500,"cost":60000000}'

API documentation → Get a free API key

FAQ

How accurate is the output?

It uses EVN’s province-level theoretical PVout; a real site can differ by ±10–15 % with shading, tilt and equipment.

How much surplus can I sell?

Up to 50 % of the theoretical monthly output (PVout × kWp) by agreement with the buyer; until 31 December 2030 more is allowed where the grid can take it.

Do I need a permit?

Low-voltage systems from 1 kW need an online notice to the commune People’s Committee at least 10 working days before installation; medium-voltage systems selling surplus need a registration certificate.