Concrete & Mortar Mix Calculator
Cement, sand, stone and water per m³ of concrete by grade, slump and stone size; mortar mixes, bricks and plaster per unit, losses and a bill of materials.
Result
Press “Run” to see the result.
Looks up the material norms of Circular 38/2026/TT-BXD, Appendix VII (in force 1 July 2026, replacing Circular 12/2021): concrete mixes 11.11000–11.13000 for PCB30, PC40 / PCB40 and PCB40 with ground slag S95 by grade (M100–M600, or strength class B3.5–B45), slump and maximum stone size; masonry / plaster mortar mixes 12.10100–12.10200 (lime-cement or cement-sand, coarse or fine sand); clay, hollow, concrete and silicate brick masonry 12.21–12.23; plastering and screeding 12.31; and the loss rates of Part 3 (construction, concrete, transfer, transport and storage).
action=bill turns quantities (m³ of concrete, m³ of brickwork, m² of plaster) into total cement (kg and 50 kg bags), sand, stone, water, lime and bricks, with and without losses, showing every code and loss rate used.
The tables are imported automatically from the signed PDF on datafiles.chinhphu.vn by a builder that cross-checks every row; misprints of the official text (duplicate codes) are flagged. Norms are the basis for estimates: real mixes must be designed by laboratory tests. Reference only.
Use this in your code
curl "https://apibox.io.vn/v1/vn-material-norms?action=concrete&grade=250&cement=PCB30&slump=6-8&dmax=20&volume_m3=10" \
-H "Authorization: Bearer YOUR_API_KEY"const res = await fetch('https://apibox.io.vn/v1/vn-material-norms?action=concrete&grade=250&cement=PCB30&slump=6-8&dmax=20&volume_m3=10', {
method: 'GET',
headers: {
Authorization: 'Bearer YOUR_API_KEY',
},
});
const data = await res.json();
console.log(data);import requests
res = requests.get(
"https://apibox.io.vn/v1/vn-material-norms?action=concrete&grade=250&cement=PCB30&slump=6-8&dmax=20&volume_m3=10",
headers={"Authorization": "Bearer YOUR_API_KEY"},
timeout=30,
)
print(res.json())<?php
$ch = curl_init('https://apibox.io.vn/v1/vn-material-norms?action=concrete&grade=250&cement=PCB30&slump=6-8&dmax=20&volume_m3=10');
curl_setopt_array($ch, [
CURLOPT_RETURNTRANSFER => true,
CURLOPT_HTTPHEADER => ['Authorization: Bearer YOUR_API_KEY'],
]);
$response = curl_exec($ch);
print_r(json_decode($response, true));API documentation → Get a free API key
FAQ
How much cement for 1 m³ of M250 concrete?
With PCB30, slump 6–8 cm and 1x2 stone (dmax 20 mm): 372 kg cement, 0.486 m³ sand, 0.793 m³ stone, 191 l water (code 11.11324), before losses.
Are losses included?
Concrete and mortar mixes exclude losses; masonry and plaster mortar quantities already include construction losses. action=bill adds the Part 3 rates and lists them.
Does it compare with Circular 12/2021?
Not yet: only TT 38/2026 (in force from 1/7/2026) is imported. The coverage field lists what is and is not included.