Construction Class Calculator (Special, I–IV)

Class of a building, tower, tank or road bridge (special, I, II, III, IV) by height, floors, floor area, span and depth under Circular 34/2026/TT-BXD.

Free tool: 20 requests per minute.

Result

Press “Run” to see the result.

Applies Appendix II, Table 2 of Circular 34/2026/TT-BXD (in force 1 July 2026, replacing Circular 06/2021): each criterion gives a class and the work takes the highest one. Buildings (section 2.1) use height (H* = 150 m fire height for fire-hazard groups F1.2, F1.3, F4.2, F4.3 and mixed-use buildings, otherwise 200 m), above-ground floors, total floor area, largest span, underground depth and underground floors; villas are never below class III. Towers (2.2.1), infrastructure masts (2.2.2), tanks and silos (2.4, one class up for hazardous chemicals, not below II) and road bridges (2.5.1) are also covered.

The class by importance / capacity of Appendix I (schools by pupils, hospitals by beds, power plants by MW…) is not computed: pass it as capacity_class and the higher class wins (Article 2.2). Projects whose investment was decided before 1/7/2026 keep the class under the old rules (Article 5) — investment_decision_date adds that warning. Checked against the worked examples of Appendix III (high school, water plant, underground car park).

Results are reference information computed from the official texts cited in legal; they are not legal advice. The reviewed date shows when the rules were last checked.

Use this in your code

curl "https://apibox.io.vn/v1/vn-construction-class?structure=building&height_m=36&floors=8&floor_area_m2=4000" \
  -H "Authorization: Bearer YOUR_API_KEY"

API documentation → Get a free API key

FAQ

A 9-floor, 32 m apartment block of 6,000 m² — which class?

Class II: height over 28–75 m and 8–24 floors give II, floor area 1,000–10,000 m² gives III; the highest wins.

Why is my school class II when the building is class III?

Appendix I classes a school by pupils; the work takes the higher of Appendix I and Appendix II. Send capacity_class.

Does Circular 34/2026 apply to old projects?

Not if the investment was decided before 1/7/2026: the class under the rules at that time is kept (Article 5).